No.
Subpackage name
Bidder’s financial, qualification and performance requirements
1
Leizhou Dongli Wind Farm installed fan-free climber
1. Qualification: The bidder's equipment must pass the EU CE safety certification or the North American access qualification UL certification, with the safety and quality inspection report issued by the national authoritative inspection agency, and report on the traction rope strength test report and safety fall arrest system inspection. The test report of the climber-free equipment issued by the bidder must be the same as the product model of the bid. Please provide proof of relevant scan.
2. Performance: The bidder must have three or more wind farms (must have an alpine region wind farm) since 2014 and no less than 50 fan-free climbers have been put into operation and successfully operated in China for more than one year. . The bid documents provided by the bidder shall be the scanned copies of past performance contracts related to the bid invitation, must include the cover of the contract, the scope of supply/renovation, and the technical specifications/major quantities of work/technical requirements, the contract time, and the signature page of the contract. Contact information such as contact information and contact information, and other performance documents that have not been provided according to the above requirements are invalid. If the performance provided by the bidder proves that the contractor is not an end user, the proof of performance must be confirmed by the end user's seal.
Note: For those that are not listed in the above table, but the country has set qualifications or permits for the subject (such as industrial product production license, "3C" certification certificate, safety production license, special equipment manufacturing license, fire equipment production license Certificates, manufacturing licenses for manufacturing of measuring instruments, computer information system integration qualifications, etc.) Bidders must provide qualification certificates or permits for the corresponding objects to qualify for participation in bids for the subject matter.
1.2.13 Other conditions stipulated in the bidding documents.
1.2.14 The bidder did not exist in the evaluation period of the project as a case where the trustee was executed. Specifically, the bidder was identified as the National Court of Default Information and the National Development Reform and Information Network (shixin.court.gov.cn). Committee Credit China () website search results prevail.
1.3 The Commonwealth does not accept bids for this consortium.
1.4 The scope of tendering is the materials, construction and mechanical equipment for the purchase and installation of the 33-fan excavator-free equipment for Leizhou Dongli Wind Farm of Guodian Power. It also includes all necessary materials, design, technical information, and technical services. Thirty-two fan-assisted climbers were dismantled and transported to designated locations in Leizhou Dongli Wind Farm. For details, see the relevant provisions of the second volume of the bidding documents.
1.5 The potential bidder must be entitled to participate in competitive bidding after obtaining bid documents from the bidding agency in his own name. The bid inviter and the bid invitation agency refused to accept the bid from the bidder who did not purchase the bidding documents. The bidder’s bid obtained by the bidder is copyrighted by the tenderer and the bidding agency and is for the purpose of this tender only.
1.6 Time for selling tender documents: From November 16th, 2016, from 09:00 to November 22, 2016, 16:00 (Beijing time).
1.7 Potential bidders wishing to purchase tender documents, (.)
1.8 Selling Bidding Documents:
The tender documents are purchased using the online payment model (wireless transfer, online banking transfer, on-site cash payment and other purchase methods are not accepted). The system also supports corporate online banking payment and personal online banking payment.
1.8.1 If purchased through a company account, corporate accounts must have online banking capabilities. When online payment is made, this website will be redirected (linked) to the bank website selected by the purchaser.
1.8.2 If purchased through a personal account, it will be considered that the purchaser has obtained authorization from the company and is equivalent to the purchase of the company. Before you purchase, verify that the online payment limit of your bank card is not less than the selling price of the bidding documents, so as not to affect the purchase of the bidding documents.
1.8.3 The bidder must be the bidder. The basic information such as bidder's name, correspondence address, contact person, and contact information that the potential bidder fills in on the platform must be accurate, and the information on the whole process of tendering and bidding should be issued and contacted.
1.8.4 After successful payment, bidders directly download the electronic version of the bidding documents from the Internet. The tenderer/bidding agency does not provide any paper tender documents. Successful payment means that the tender documents have been sold. Except for the reasons of the tenderer or the bidding agency, the tender documents will not be refunded once sold.
1.8.5 The bidding agency will mail the commercial invoice for the bidding documents to potential bidders as soon as possible according to the mailing address filled in when purchasing the bidding documents.
1.8.6 Failure to purchase the bidding documents or other issues, please contact customer service center.
1.9 Tender Equipment List and Bidding Documents Price:
No.
Equipment name and specifications
Quantity
Tender Document Price (yuan)
Delivery date
Tender number
Bid security (yuan)
mentPrice_8320">1
Leizhou Dongli Wind Farm installed fan-free climber
1200 yuan
Within 30 days after signing the contract
GDCX04-JGZB16-0782/01
50000 yuan
1.10 Deadline of Bidding Documents: The deadline for submitting electronic tender documents by bidders is 14:00 (Beijing time) on December 06, 2016. Overdue or non-compliant tender documents are not accepted.
1.12 Time and place for the opening of bids: The opening time for the bid is 14:00 on December 06, 2016.
Contact: Zhang Jie
Mobile:
phone
fax
E-mail:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.
We are famous power factory in china.We mainly offer led switching power supply,dual outpout led switching power,IP67 led power,waterproof led power,IP67 Outdoor Power,IP20 Indoor Power,IP20 led power,Ultra thin led power,outdoor led power etc.They widely use for led strip light,led wall wash light,led
underwater light,led inground light,led spike light,etc.
Ip20 Ultra Slim Hcc L Power,Led Switching Power Supply,Ip20 Ultrathin Power Supply,Dual Output Led Switching Power
Jiangmen Hua Chuang Electronic Co.,Ltd , https://www.jmhcpower.com