Tender Notice for Lighting and Cable Equipment Installation Project of Shiplock Pilot Channel of Water Conservancy Project


Tender No.: C01000309GZ01SD17001
Tendering Agent: China Electric Power Complete Equipment Co., Ltd. Owner: Guangxi Changzhou Hydropower Development Co., Ltd. Application Deadline: 2009-07-28
Area: Guangxi Industry: Electrical and electronic equipment, metallurgy and mineral raw materials

China Electric Power Complete Equipment Co., Ltd. was entrusted by the tenderer to openly invite the lighting and cable equipment installation of the navigation channel of the Changzhou Water Conservancy Project in Guangxi.

I. Basic information of the project Tenderer: Guangxi Changzhou Hydropower Development Co., Ltd. Design unit: Guangxi Electric Power Industry Survey and Design Institute Tendering Agency: China Electric Power Complete Equipment Co., Ltd. Project Location: Guangxi Yinzhou Project Source: Guangxi Changzhou Hydropower Development Limited liability company capital and bank loans

Second, the list of bidding conditions of the bidding number, the number of the bidding number, the number of the main part of the bidding documents, the cost of the bidding documents (yuan)
01 C01000309GZ01SD17001 Ship lockway lighting and cable equipment installation 1 The start-up project of Changzhou Water Conservancy Project was officially started on December 27, 2003. It is planned to complete the acceptance test in December 2009. (1) Installation, commissioning, acceptance, and handover of related services for lighting equipment of the ship's navigation channel.
(2) Laying of lighting, broadcasting, industrial television, and signal light cables (including construction of bridges, open pipes, trenching pipes, and cable hanging lines);
(3) Self-purchased equipment lighting fixtures, junction boxes, maintenance power boxes, wire ropes, pull frames, buried pipes, well materials, etc. and transportation and storage;
(4) The equipment (cables and bridges) provided by the contractor shall be transported and kept from the grounding point to the construction site until installation, commissioning, trial operation and handover acceptance.
It takes 2 months to install and commission the lighting, cable equipment installation, commissioning, acceptance and handover of the navigation channel of the ship lock. 1000.00

Third, the bidder qualification requirements
(1) Basic qualification requirements
1. The bidder shall have the legal person qualification to independently conclude the contract;
2. With a sound quality management system, it must hold an ISO9001 certification issued by a nationally recognized qualification institution or an equivalent quality management system certification;
3. In the past three years, the bidder shall have similar performance as the bidding target of the project;
4. In the past three years, there have been no bad behaviors such as fraudulent bidding and serious breach of contract;
5. Not being ordered to close down, property being taken over, frozen and bankrupt;
6. The business is in good condition and has been profitable for more than two consecutive years.
(2) Special qualification requirements No.
01 Ship locker navigation channel lighting, cable equipment installation 1. Bidders should have legal person business license and water conservancy and hydropower engineering mechanical and electrical equipment installation three-level construction qualification
2. Construction experience: At least one similar project has been undertaken in the past 5 years, and no major engineering accidents have occurred.
3. Construction equipment: The bidder shall be able to guarantee the timely provision of the construction equipment required for the contract construction and the equipment shall be in good condition, and the quantity and variety shall meet the construction requirements of this contract.
4. Main personnel: The number of management and technical personnel to be engaged in the implementation of this contract shall be in place and shall have rich experience. The project manager and technical person in charge of the construction of this contract shall meet the following conditions:
Project Manager: Having the qualification of a secondary project manager and more than 5 years of similar engineering construction, or experience in mechanical and electrical equipment and metal structure installation (there should be a project similar to the scale of this project), at least one project manager.
Technical leader: With more than 5 years of similar engineering construction, or experience in mechanical and electrical equipment and metal structure installation (two of which are similar to this project), at least one of the technical leaders of the project.
5. Safety Qualification: It has the safety qualification certificate for construction and installation enterprises and the safety construction record for the past three years. It provides the safety organization and the safety full-time management personnel, and provides the safety production management system.

Fourth, the issue of the tender documents
(1) Time and place of sale
1. Release time: from now on - July 10, 2009, 9:00-11:30 am, 13:30-16:30 pm (excluding holidays)
2. Place of sale: Department of Hydropower Wind Power, Office Building, China Electric Power Complete Equipment Co., Ltd. (15 Andri North Street, Andingmen, Dongcheng District, Beijing, China, 100011)
(2) Purchase method
1. The purchaser will purchase the bidding documents at the above-mentioned place of sale during the above-mentioned sale time. The following documents must be provided when purchasing the bidding documents:
(1) The power of attorney of the legal representative;
(2) My ID card;
(3) Paper documents and electronic documents (see Appendix for the format of the registration form for the purchase of bidding documents).
2. Wire transfer purchase within the above-mentioned release time, the purchase of the bidding documents (if you need to mail the bidding documents, increase the mailing fee of 100 yuan / tender) to the company's designated remittance account and the following documents to be provided when purchasing the bidding documents Fax the information to our company and send the electronic file information to the designated email address.
(1) The power of attorney of the legal representative;
(2) A copy of the ID card of the authorized person;
(3) A copy of the bank remittance receipt;
(4) Paper documents and electronic documents (see Appendix for the format of the registration form for the purchase of bidding documents).
After receiving the fax, our company will provide the paper bidding documents according to the purchase unit's requirements, and send the electronic version of the bidding documents to the purchasing unit by e-mail or please visit the China Power Equipment Information website for download.
The purchase of the tender documents and the account bank are as follows:
Name of the unit: China Electric Power Complete Equipment Co., Ltd. Account Bank: Beijing Industrial and Commercial Bank Liupu Branch
(III) Contact person for purchasing bidding documents, contact information Unit name: China Power Complete Equipment Co., Ltd. Contact: Shi Jing Tel: (010) 51965532, 13911619906
Fax: (010) 51965530
mailbox:
(IV) Contact Persons and Contact Information of Bidding Documents Name: Guangxi Changzhou Hydropower Development Co., Ltd. Contact: Pan Yang (Plan Operation Department)
Tel: (0774) 6026023, 13877485859
Fax: (0774) 6026000
mailbox:
(5) Other matters
1. The tender will not be returned after it is sold.
2. Pre-standard inspection: At 15:00 on July 14, 2009, Cheung Chau Hydropower Company (Golden Court Hotel, No. 3 Xinxing 3rd Road, Cangzhou, Guangxi) departed. The bidder is required to bring his own vehicle and take safety measures (hardhats, etc.). The bidder shall fully understand the safety regulations of the hydropower station, and the safety responsibility during the on-site inspection shall be borne by the bidder.

V. Bidding/Bid Opening Time, Location Bidding/Bid Opening Time: July 28, 2009 at 10:00 am (Beijing time)
Bidding/Bid Opening Location: Meeting Room 1701, Changzhou Hydropower Company, Jinyuan Hotel, No. 3 Xinxing 3rd Road, Cangzhou, Guangxi
(Source: http://)

Metal Spraying Accessories

Metal Spraying Accessories,Pump Sprayer,Pressure Sprayer,Agriculture Sprayer Parts

Shaoxing Tianlong Tin Materials Co.,Ltd. , https://www.tianlongspray.com